Ditch configurations
Each section has its own ditch shape, pipe position and lifts. The job total adds up every section. Delete this section
Ditch section
Pipe
Use this for over-dug ditch: the pipe sits up off the ditch bottom and the gap gets filled by the first lift(s).
Lifts / set points
Each lift fills from the top of the lift below it up to its own set point. A set point = reference + offset (negative = below, positive = above).
Backfill materials
MaterialFactor %t/m³
Materials are shared by every section. Factor % adds for compaction/swell to give a loose (haul/order) quantity. t/m³ is optional compacted density for tonnes. Tap the colour box to change a material's colour.
Cross section
Section quantities
Set points
"↑ Btm" is measured up from the ditch bottom. "↓ Surf" is measured down from original ground. Elevations show when a ground elevation is entered.